Skip to content
Polk Regional Water Cooperative Logo
  • Agency
    • – About PRWC
    • – Member Governments
    • – Financials
    • – Procurement
  • Projects
    • – Overview & Interactive Map
    • – Southeast Wellfield and Water Production Facility
    • – West Polk Wellfield and Water Production Facility
  • Conservation
    • – Conservation Tips
    • – Irrigation Systems
    • – Rain Barrels and Cisterns
    • – Florida Friendly Landscaping
    • – Rebates and Incentives
    • – Kids 4 Water Conservation
    • – Resource Library
  • Resources
    • Documents
    • FAQs
  • News & Events
    • In The News
    • Event Calendar
  • Contact
  • Agency
    • – About PRWC
    • – Member Governments
    • – Financials
    • – Procurement
  • Projects
    • – Overview & Interactive Map
    • – Southeast Wellfield and Water Production Facility
    • – West Polk Wellfield and Water Production Facility
  • Conservation
    • – Conservation Tips
    • – Irrigation Systems
    • – Rain Barrels and Cisterns
    • – Florida Friendly Landscaping
    • – Rebates and Incentives
    • – Kids 4 Water Conservation
    • – Resource Library
  • Resources
    • Documents
    • FAQs
  • News & Events
    • In The News
    • Event Calendar
  • Contact

West Polk Wellfield and Water Production Facility

The goal of this project is to utilize the brackish, Lower Floridan Aquifer (LFA) in Western Polk County as a water supply. The West Polk Wellfield is a permitted supply, and after treatment via reverse osmosis, will deliver up to 10 million gallons per day (MGD) of high-quality drinking water to the member governments.

Desalination removes dissolved substances in groundwater, seawater and municipal wastewaters to make water fit for human consumption, irrigation, industrial and other uses. Desalination is usually accomplished through a process called reverse osmosis, which purifies salt or brackish water by forcing it through semi-permeable membranes. These membranes act as filters that collect heavy metals and other compounds while the water passes through. This technology is already used throughout Florida.

Open Project Alignments Map

Project Scope

  • Production/test well construction and testing
  • Source water quality and yield analysis
  • Water use permitting
  • Conceptual design report
  • Pilot testing
  • Preliminary design
  • Rate analysis

LFA Brackish Ground Water Supply

  • Raw water wellfield and transmission pipeline
  • Advanced water treatment plant​
  • Injection wells​
  • Transmission​
Target Yield = 10 MGD

Project Status

supporting the withdrawal of the 12.5 MGD permitted allocation. A preliminary design report for this water production facility and transmission system was accepted by the Southwest Florida Water Management District (SWFWMD) in October of 2021. Final design began in October 2022.

SWFWMD is a significant funding partner, providing nearly 50% grant funds to this project. The State of Florida has allocated over $4 M in appropriations to this project over the past few years and is providing low-interest State Revolving Fund loans, The PRWC has also been invited by the U.S Environmental Protection Agency (EPA) to apply for a low-interest WIFIA loan to design and construct the first phase of the Southeast Wellfield . This loan opportunity will provide the PRWC flexibility in its funding of these initial projects.

LFA Well Water goes to RO Treatment then to a Degas and Clearwell and ends with Storage and Pumping
Well drilling equipment for the West Polk Wellfield and Water Supply Facility
Well drilling equipment for the West Polk Wellfield and Water Supply Facility

© 2020 Polk Regional Water Cooperative

Facebook-f Linkedin Youtube
en English▼
X
ar Arabiczh-CN Chinese (Simplified)nl Dutchen Englishfr Frenchde Germanit Italianpt Portugueseru Russianes Spanish
Accessibility
Terms
Privacy

Media Kit

Downloads

  • B-Roll Video Clips
  • Style Guide
  • Logo Files

Have Questions?

View our FAQs